Have you ever done a 203(k) finance project?

            If so, was the job a streamline (limited) or a full K?

Do you have a valid Connecticut license? 

            Is the category a General Contractor, i.e. HIC?

            When does the license expire?

Do you have a valid EPA Lead Safe Practices Certificate?

            When does the certificate expire?

Do you have at least $1,000,000.00 in liability insurance?

Are you aware there is no upfront deposit money?  

Are you aware that there is a 10% hold back for each draw that isn’t released until the final inspection?

Are you aware you will be expected to pull any required permits?